HUAWEI BTS3900 INSTALLATION MANUAL PDF

BTS GSM Installation Guide(V_13).pdf – Download as PDF File .pdf), and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. What is a base station installation guide 1) Introduction to base stations BTS Installation Guide for Enhancing Existing Cabinets ( Registering for a free account gives you a number of additional benefits, including access to additional valuable information that you can browse or download.

Author: Samumuro Kem
Country: Ethiopia
Language: English (Spanish)
Genre: Medical
Published (Last): 24 June 2004
Pages: 136
PDF File Size: 18.70 Mb
ePub File Size: 13.6 Mb
ISBN: 892-5-82780-170-7
Downloads: 48207
Price: Free* [*Free Regsitration Required]
Uploader: Bratilar

Sufficient slack recommended for about 0. The figure of the GPS surge protector is for reference only.

Installing The Bbu Case Step 1 Align mounting holes on the cable holders with mounting holes on both sides of the BBU case, and then use two M4 screws on each side to secure the cable holes to 1. Figure shows the installation procedure. It focuses on hardware installation operations to be performed onsite. Optional installing A Cpri Optical Fiber The performance of an optical module that is exposed to the air for yuawei than 20 minutes may be abnormal. Page Ensure that the heads of all the cable ties are outside the cabling teeth, as shown nistallation Figure C Hardware Description — Safety Information During the installation, you must familiar with the following reference document: Installation Guide for Capacity Expansion.

Page 77 Fiber optic cables cannot be squeezed by the cabinet door when routed through the cabinet, as shown in FigureFigure Figure Remove the dustproof caps from the optical connectors at the end labeled 1A and 1B on the fiber optic cables, and insert the optical connectors into the optical modules in BBU 1. Use a screwdriver to tighten the screws on the wiring terminals. The cabinets are installed in a row in the same equipment room for easy cabling.

Related Posts  BOLEX BIBLE PDF

Welcome to Our Website

When 3 phase power is used, the short circuit bar should be removed; when single phase power is used, install the short circuit bar. If the resistance is greater than or equal to five megohms, you can infer that the cabinet is insulated from the floor.

Before a cabinet is installed, you must familiar with the cabinet structure, application scenario, and space requirements. Types of base stations. Installation Checklist Installation Environment Checklist Table describes the installation environment checklist.

Table Of Contents 2. Preparing For Installation mannual. Page 27 Sign the Packing List with the customer. In a triple-mode scenario, two BBUs are configured. Step 1 Align mounting holes on the cable holders with mounting holes on both sides of the BBU case, and then use two M4 screws on each side to secure the cable holes to 1.

The transmission installatoin is fed with external power supply since DCDUA does not support power supply to transmission equipment. The following figure is an example for series base stations. This document describes how to restructure the existing base station to support capabilities of new base stations while saving site space.

Reset Password

installatiln The performance of an optical module that is exposed to the air for more than 20 minutes may be abnormal. Step 2 Check the exterior of the packing case. Page 6 Press the keys in turn. Comments to this Installatiln Your Name. New deployment This document applies to sites where computers cannot be used to view the documents.

Compared with issue 06no topic is added. Capacity expansion This document describes how to install hardware for a running base station.

Before the installation, pay attention to the following items: Figure BTSL in a single- or dual-mode scenario 1.

Procedure Step 1 Determine the position of the cabinet by referring to the marking template, as shown in Figure CPRI fiber optic cables are routed out of the cabinet through the nearer left or right cable outlet.

Related Posts  GENESER HISTOLOGIA PDF

Don’t have an account?

3900 Series & 5900 Series Base Station Installation Guides

Skip to main content. Compared with issue 05this issue adds the following contents: Page Remove the dustproof caps from the optical connectors at the end labeled 1A and 1B on the fiber optic cables, and insert the optical connectors into the optical modules in BBU 1. Page 79 Locate the cables around the binding bracket according to the figures huaweei the spatial positions of the cables. Enter text from picture: Quick Installation Guide A simplified graphical document, which can be printed and easily carried.

Huawei BTSA Installation Guide V1 5 | Pradeep Liyanage –

Page The connectors of the RF cables are fixed in position to avoid false connection that may cause an abnormal voltage standing wave ratio VSWR. Gently slide the board into the slot.

A simplified graphical document, which can be printed and easily carried. The number of onsite huaaei depends on the engineering schedule and installation environment. The connectors need to be made on site. Secure cables on the cable tray, as shown in Figure The installation of cabinets must meet the requirements of the proper design, practical installation, and elegant layout. Connected to the jumper of the base station.

Page 33 Check whether the power cables are securely connected, installstion the screws are tightened on the cables ihstallation the cabinet by referring to Figure Table To print the manual completely, please, download it.